CAN LLUQUI

Private swimming pond. Sant Joan de Labritja, Ibiza.
Year 2022
Surface area 160 m2
Prof. max. 2.5 m
Slow vertical filtration
Filter bomb 45w/h
Acabado: cal hidráulica
In this work a high degree was achieved in terms of the reduction of the ecological hue. The reconstruction of the pallet was carried out with the extra material of the own excavation: a retaining wall composed of bags of yutes filled with earth, established, using a construction system similar to the Superadobe, combined with a high exterior of the wall formed by the rock of the place , continuing the existing pay wall.
The biofilter, delimited by a stone chimney that connects the accesses to the lake with the adjacent sauna, which is visually connected by a single view of water.

weitere Bilder